Leave Your Message

MEDICAL DEVICES · JIANGSU, CHINA

Cardiac Stent Cleanroom Project

A closer look at the room finishes, workstations and service interfaces in this medical-device cleanroom.

Cleanroom interior with wall panels, ceiling lighting and blue doors
01 / 05Room overview
Stainless steel washing station beside a low level cleanroom grille
02 / 05Washing station
Glazed workstation with service ports and adjacent cleanroom door
03 / 05Workstation interfaces
Wall mounted stainless steel connections labelled purified water
04 / 05Purified-water connections
Recessed fire equipment cabinet within a cleanroom column
05 / 05Recessed service cabinet

Room envelope

Panels, doors and floor junctions.

Airflow interfaces

Ceiling terminals and low-level grilles.

Process services

Washing and water connection details.

Planning a medical-device cleanroom?

Share your process needs and equipment layout to discuss a project-specific scope.

Discuss your project