English Chinese Simplified Chinese Traditional French German Portuguese Spanish Russian Japanese Korean Arabic Irish Greek Turkish Italian Danish Romanian Indonesian Czech Afrikaans Swedish Polish Basque Catalan Esperanto Hindi Lao Albanian Amharic Armenian Azerbaijani Belarusian Bengali Bosnian Bulgarian Cebuano Chichewa Corsican Croatian Dutch Estonian Filipino Finnish Frisian Galician Georgian Gujarati Haitian Hausa Hawaiian Hebrew Hmong Hungarian Icelandic Igbo Javanese Kannada Kazakh Khmer Kurdish Kyrgyz Latin Latvian Lithuanian Luxembou.. Macedonian Malagasy Malay Malayalam Maltese Maori Marathi Mongolian Burmese Nepali Norwegian Pashto Persian Punjabi Serbian Sesotho Sinhala Slovak Slovenian Somali Samoan Scots Gaelic Shona Sindhi Sundanese Swahili Tajik Tamil Telugu Thai Ukrainian Urdu Uzbek Vietnamese Welsh Xhosa Yiddish Yoruba Zulu Kinyarwanda Tatar Oriya Turkmen Uyghur Abkhaz Acehnese Acholi Alur Assamese Awadish Aymara Balinese Bambara Bashkir Batak Karo Bataximau Longong Batak Toba Pemba Betawi Bhojpuri Bicol Breton Buryat Cantonese Chuvash Crimean Tatar Sewing Divi Dogra Doumbe Dzongkha Ewe Fijian Fula Ga Ganda (Luganda) Guarani Hakachin Hiligaynon Hunsrück Iloko Pampanga Kiga Kituba Konkani Kryo Kurdish (Sorani) Latgale Ligurian Limburgish Lingala Lombard Luo Maithili Makassar Malay (Jawi) Steppe Mari Meitei (Manipuri) Minan Mizo Ndebele (Southern) Nepali (Newari) Northern Sotho (Sepéti) Nuer Occitan Oromo Pangasinan Papiamento Punjabi (Shamuki) Quechua Romani Rundi Blood Sanskrit Seychellois Creole Shan Sicilian Silesian Swati Tetum Tigrinya Tsonga Tswana Twi (Akan) Yucatec Maya
EPC Engineering / Commissioning

Cleanroom Commissioning & Qualification Support

Coordinate systems, test plans and records around the agreed project scope. Define who performs tests, reviews results and approves release before work begins. Share the system list, requirements and proposed testing plan.

Discuss Your Test Scope →View the Sequence →
Cleanroom utility pipework and connections
Scope & Responsibilities

How Do Commissioning and Qualification Differ?

Commissioning

Check how installed systems operate through agreed start-up, functional checks, adjustments and records.

Qualification Support

Coordinate technical documents, access and follow-up for testing against approved requirements and protocols.

Independent Testing

Define the appointed testing party, responsibilities, deliverables and client review process in the project scope.

Commissioning records may support qualification when accepted by the project's quality process.

Project Sequence

How Are Checks Planned and Reviewed?

01

Define

Identify systems, intended use and acceptance criteria.

02

Prepare

Review installation status, instruments and procedures.

03

Check

Perform assigned tests and record results and findings.

04

Review

Resolve findings and submit records to responsible reviewers.

Acceptance Planning

What Should Acceptance Cover by Industry?

Agree acceptance criteria, test states and responsible reviewers with the owner before the tests begin.

Sterile Pharmaceuticals

Confirm applicable room grades and qualification protocols. Agree test states, filter integrity checks, pressure measurements and airflow visualisation as applicable.

EU GMP Annex 1 and Annex 15

Electronics & Semiconductor

Define the product-exposure zones. Where air classification is specified, record particle sizes, sampling locations and the agreed occupancy state.

ISO 14644-1 particle classification

Food & Beverage

Review hygienic zoning, equipment cleanability and separation against the facility’s process and sanitation plan. Verify applicable local food requirements.

U.S. facility requirements example

Trace acceptance criteria back to the URS →

System Interfaces

What Needs to Be Reviewed?

HVAC & Room Conditions

Define relevant airflow, filtration, pressure and room-condition checks.

Utilities & Equipment

Review media, connections, operating prerequisites and supplier documents.

Controls & Monitoring

Coordinate points, operating sequences, alarms and required records.

Cleanroom measurement activity
Handover

Clear Records for Review

Agree which procedures, instrument references, test records, outstanding items, drawings and operating documents are included.

Agree the Test and Review Record Set
Coordination Point Information to Agree
Test Preparation Identify systems, intended use and acceptance criteria.
Assigned Checks Perform assigned tests and record results and findings.
Review and Handover Procedures, instrument references, test records, outstanding items, drawings and operating documents.

HVAC System →   Utility System →   After-Sales Support →

Useful Answers

Common Questions

Is qualification the same as commissioning?

Commissioning concerns system operation. Qualification uses approved requirements, protocols and records.

Does this service include independent certification?

Independent testing, certification and approval are separate responsibilities defined in the project scope.

What information is needed to discuss support?

Share the system list, requirements, project stage, available documents and proposed testing plan.

Discuss Your Test Scope

Share your systems and project requirements to discuss the next steps.