Commissioning
Check how installed systems operate through agreed start-up, functional checks, adjustments and records.
Coordinate systems, test plans and records around the agreed project scope. Define who performs tests, reviews results and approves release before work begins. Share the system list, requirements and proposed testing plan.
Discuss Your Test Scope →View the Sequence →
Check how installed systems operate through agreed start-up, functional checks, adjustments and records.
Coordinate technical documents, access and follow-up for testing against approved requirements and protocols.
Define the appointed testing party, responsibilities, deliverables and client review process in the project scope.
Commissioning records may support qualification when accepted by the project's quality process.
Identify systems, intended use and acceptance criteria.
Review installation status, instruments and procedures.
Perform assigned tests and record results and findings.
Resolve findings and submit records to responsible reviewers.
Agree acceptance criteria, test states and responsible reviewers with the owner before the tests begin.
Confirm applicable room grades and qualification protocols. Agree test states, filter integrity checks, pressure measurements and airflow visualisation as applicable.
EU GMP Annex 1 and Annex 15Define the product-exposure zones. Where air classification is specified, record particle sizes, sampling locations and the agreed occupancy state.
ISO 14644-1 particle classificationReview hygienic zoning, equipment cleanability and separation against the facility’s process and sanitation plan. Verify applicable local food requirements.
U.S. facility requirements exampleDefine relevant airflow, filtration, pressure and room-condition checks.
Review media, connections, operating prerequisites and supplier documents.
Coordinate points, operating sequences, alarms and required records.

Agree which procedures, instrument references, test records, outstanding items, drawings and operating documents are included.
| Coordination Point | Information to Agree |
|---|---|
| Test Preparation | Identify systems, intended use and acceptance criteria. |
| Assigned Checks | Perform assigned tests and record results and findings. |
| Review and Handover | Procedures, instrument references, test records, outstanding items, drawings and operating documents. |
Commissioning concerns system operation. Qualification uses approved requirements, protocols and records.
Independent testing, certification and approval are separate responsibilities defined in the project scope.
Share the system list, requirements, project stage, available documents and proposed testing plan.
Share your systems and project requirements to discuss the next steps.