Dynamic Pass Box-DPB
Selection Inputs
Confirm the interlock arrangement, transfer direction and door sequence.
Match chamber size, door configuration and installation opening to the transfer load.
Review airflow and filtration arrangements, electrical supply, controls and service access.
Agree construction materials, internal cleaning access and cable-entry position.
Where UV or ozone is specified, confirm the configuration, operating restrictions and required validation documents.
Standard Size and Basic Performance Parameters
| Model number | Overall dimension | Work area size |
The value of the outlet determines the wind speed |
noise | Power supply | |
| W×H×D | W×H×D | (m/s) | (W) | (dB) | (kw) | |
| KS-LCTW3-040040 | 620x460x950 | 400×400×400 |
0.45±20% |
6*2 |
65 |
0.2 |
| KS-LCTW4-050050 | 720x560x1050 | 500×500×500 | 8*2 | |||
| KS-LCTW6-060060 | 820x660x1150 | 600×600×600 | 8*2 | |||
| KS-LCTW6-060080 | 820x660x1350 | 600×600×800 | 8*2 | |||
| KS-LCTW8-070070 | 920x760x1250 | 700×700×700 | 15*2 | |||
| KS-LCTW10-080080 | 1020x860x1350 | 800×800×800 | 20*2 |
0.3 |
||
| KS-LCTW16-100100 | 1220x1060x1600 | 1000×1000×1000 | 20*2 | |||
Product Detail
Select the KS-LCTW model around the transfer load, chamber opening, door sequence and installation interfaces. Match the unit to the project layout and service access.
Confirm the airflow arrangement, electrical supply, controls and operating cycle from the selected model documentation. Agree any cleanliness or treatment requirements, verification criteria and operating restrictions before approval.
Dynamic Pass Box Selection FAQ
How Should the KS-LCTW Model Be Selected?
Share transfer-item dimensions, the installation opening, door access and room layout. Match the selected chamber and door arrangement to the transfer route.
Which Airflow and Filtration Details Need Confirmation?
Review the selected model documentation for airflow and filtration arrangements, controls, electrical connections and service access. Agree the project requirements and verification criteria before approval.
How Are UV or Ozone Requirements Reviewed?
Confirm the supplied configuration, operating instructions, restrictions and any project-specific validation requirements for the selected model and procedure.
Installation and airflow coordination: HVAC System · Technical Details.
Updated
